← All jobs
GA

Senior Manager, Data Center Construction

GalaxyAfton, Texas
Type
Contract
Work setup
On-site
Experience
Senior
Posted
Today

What security roles in crypto pay

50 salaries · our own data
median $202k$141k$273k

Most security roles in crypto pay between $141k and $273k, with a median of $202k.

As Senior Manager, Data Center Construction at Galaxy's Helios campus in Afton, TX, you are the accountable leader for construction of a large-scale data center building. You report to the VP, Campus Construction Manager and work alongside peer Senior Managers, each owning a building or scope with shared accountability for safety, schedule, cost, and quality. You own your building from preconstruction handoff through commissioning and turnover to operations, leading the on-site Galaxy team and contractor relationships that deliver it.

What you'll do

  • Own data center facility delivery as the single point of accountability from GMP handoff through energization, Level 1-5 commissioning, integrated systems testing, and turnover to operations, driving the facility to its safety, schedule, cost, and quality commitments.
  • Manage the building schedule, track progress against baseline, identify critical-path threats early, and direct recovery and mitigation plans before they affect milestones.
  • Maintain a quantified risk register covering schedule, cost, supply chain, labor, weather, and trade-interface risks, and drive mitigation before exposure becomes impact.
  • Set and enforce Galaxy's safety standards at the building level, partnering with Galaxy EHS and contractor safety leadership to sustain a zero-incident environment.
  • Manage day-to-day and executive-level relationships with the general contractor and key trade partners, ensuring alignment on milestones, quality, safety, staffing, and commercial performance.
  • Oversee pay applications, change orders, forecasts, and budget tracking under the GMP, enforce disciplined change management, and provide accurate cost reporting to campus and executive leadership.
  • Own the facility's integrated cost, schedule, and cash flow forecast on a monthly cycle, validate GC-reported progress against independent percent-complete and earned value analysis, and give leadership a reliable view of capital deployment and funding requirements.
  • Administer the GMP agreement and related owner contracts, including notices, allowances, buyout and savings, delay and impact claims, backcharges, retainage, and lien waivers.
  • Work closely with Pre-Construction and the OFCI procurement and logistics teams to ensure owner-furnished equipment (UPS, generators, chillers, switchgear, and others) arrives, is set, and is installed without impacting the construction schedule.
  • Coordinate with the serving utility, interconnect and substation teams, and Galaxy's power development group to align permanent power availability, energization sequencing, and test windows with construction and commissioning milestones.
  • Partner with the on-site commissioning manager, 3rd party Cx agent, and operations teams to ensure systematic testing, closeout, and clean turnover of the building to operations.
  • Serve as the construction lead for customer-facing delivery milestones, including ready-for-service dates, ensuring facility handoff meets contractual commitments and the customer's acceptance criteria.
  • Enforce Galaxy's QA/QC standards on your building and escalate and resolve systemic quality issues with contractors and design partners.
  • Work with peer Senior Managers and the VP to resolve cross-building conflicts in resources, laydown, site logistics, access, utilities, and sequencing.
  • Apply Galaxy's modularization, prefabrication, and lean delivery initiatives on your building, and capture lessons learned so each building is more repeatable than the last.
  • Work with local authorities, inspectors, utilities, and consultants to ensure compliance with codes and permit requirements.
  • Provide frequent, candid status updates to senior leadership and communicate building status, risks, and forecasts to internal stakeholders across Pre-Construction, Design Engineering, Operations, and Security.

What you bring

  • A Bachelor's degree in Construction Management, Engineering, Architecture, or equivalent experience.
  • 7+ years of experience delivering large-scale mission-critical projects, with at least 3 years in a senior role leading a project or building team through construction.
  • Demonstrated success delivering a data center or comparable mission-critical facility from start of construction through commissioning and turnover.
  • Working knowledge of construction delivery models (including GMP), risk management, and contractor oversight.
  • Technical fluency across MEP, commissioning, civil, and structural systems.
  • Experience integrating OFCI equipment and supporting commissioning.
  • Strong command of cost control, change management, and schedule analysis.
  • Familiarity with Procore, Primavera P6, Bluebeam, and SharePoint.
  • Full-time, on-site presence at Helios (Afton, TX).
  • A track record of leading and developing high-performing construction teams.
  • Excellent communication skills and the ability to influence technical and executive stakeholders.
  • Sound judgment under pressure and a bias toward early, honest escalation.
  • A commitment to safety, quality, and executional excellence.
  • A passion for building world-class infrastructure that supports the growth of the digital economy.

What we offer

  • Competitive base salary and discretionary bonus
  • Paid time off
  • Company-paid health and protective benefits for employees, partners, and other dependents
  • 11 company-paid holidays
  • 3% 401(k) company contribution
  • Generous paid parental leave
  • Free virtual coaching and counseling sessions through Headspace
  • Opportunities to learn about the crypto industry
  • Free daily snacks and weekly meal in-office
  • Employee Resource Groups

About Galaxy

Galaxy Digital Inc. (Nasdaq: GLXY) is a global leader in digital assets and data center infrastructure. The company delivers on-chain infrastructure that connects institutions to digital assets, including trading, advisory, asset management, staking, self-custody, and tokenization, and develops and operates data center infrastructure to power AI and HPC workloads. Anchored by its Helios campus in Texas, Galaxy is building a multi-gigawatt pipeline of more than 5.7 GW of potential capacity, positioning it among the largest and fastest-growing data center developers in North America.

Context for this role

From the live jobs we track on CryptoJobsHQ, updated daily.

Galaxy on CryptoJobsHQ

Galaxy has 22 open roles on CryptoJobsHQ: 8 in Legal & Compliance, 5 in Engineering and 3 in Operations. 14% are fully remote, most of the rest in the US and the Netherlands. 2 were posted in the last 7 days.

All 22 Galaxy roles →
The market for Infrastructure roles

1,379 Infrastructure roles are open across crypto right now.

Browse Infrastructure Jobs →
Similar roles at other companies
Get an email when Galaxy posts new roles. One email a day at most, only when there is something new.